Publications of Ghosh, J.B. sorted by title
A
Analysis of Lagrangian lower bounds for a graph partitioning problem (2000), in: Operations Research, 47(785-788) | and ,
B
Batch scheduling to minimize maximum lateness (1998), in: Operations Research Letters, 21(77-80) | and ,
Batch Scheduling to minimize the weighted number of tardy jobs (2008), in: Computers and Industrial Engineering, 53(394-400) | and ,
C
Complexity of the discrete time-cost tradeoff problem for project networks (1997), in: Operations Research, 45(302-306) | , , and ,
Computational aspects of the maximum diversity problems (1997), in: Operations Research Letters, 19(175-181) | ,
Customer order scheduling on a single machine with family setup times: complexity and algorithms (2007), in: Applied Mathematics and Computation, 185(11-18) | and ,
F
FPTAS for half-products minimization with scheduling applications (2009), in: Discrete Applied Mathematics, 156(3046-3056) | and ,
I
ISO 9000 implementation in Turkish industry (1998), in: Int J of Operations and Production Management, 17(1233-1246) | and ,
J
Job selection in heavily loaded shop (1997), in: Computers and Operations Research, 24(141-145) | ,
N
New heuristic for the dynamic layout problem (2004), in: J of Operational Research Society, 54(1275-1282) | , and ,
S
Scheduling to minimize the coefficient of variation (1997), in: Int J of Production Economics, 44(249-253) | , and ,
Scheduling with tool changes to minimize total completion time under controllable machining conditions (2006), in: Computers and Operations Research, 34(2130-2146) | , and ,
Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance (2003), in: Naval Research Logistics, 50(15-30) | , and ,
Scheduling with tool changes to minimize total completion time: Basic results and SPT performance (2004), in: European J of Operational Research, 157(784-790) | , and ,