Publications of Erel, E. sorted by journal
A
Customer order scheduling on a single machine with family setup times: complexity and algorithms (2007), in: Applied Mathematics and Computation, 185(11-18) | and ,
Coordination of staffing and pricing decisions in a service firm (2008), in: Applied Stochastic Models in Business and Industry, 24(307-323) | and ,
Coordination of staffing and pricing decisions in a service firm (2008), in: Applied Stochastic Models in Business and Industry, 24(307-323) | and ,
C
Batch Scheduling to minimize the weighted number of tardy jobs (2008), in: Computers and Industrial Engineering, 53(394-400) | and ,
Binary integer formulation for mixed-model assembly line balancing problem (1998), in: Computers and Industrial Engineering, 34(451-461) | and ,
Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version (2011), in: Computers and Operations Research, 37(649-655) | , and ,
D
FPTAS for half-products minimization with scheduling applications (2009), in: Discrete Applied Mathematics, 156(3046-3056) | and ,
E
Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling (2008), in: European J of Operational Research, 186(915-930) | , and ,
Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling (2008), in: European J of Operational Research, 186(915-930) | , and ,
Robust scheduling and robustness measures for the discrete time/cost trade-off problem (2011), in: European J of Operational Research, 207(633-643) | , and ,
Multicriteria inventory classification using a genetic algorithm (1997), in: European J Operational Research, 105(29-37) | and ,
Multicriteria inventory classification using a genetic algorithm (1997), in: European J Operational Research, 105(29-37) | and ,
Shortest route formulation of mixed-model assembly line balancing problem (1999), in: European J Operational Research, 116(194-204) | and ,
Optimal timing of project control points (2000), in: European J Operational Research, 127(252-261) | and ,
I
Analysis of assembly systems for interdeparture time variability and throughput (2002), in: IIE Transactions, 34(23-40) | , and ,
Analysis of assembly systems for interdeparture time variability and throughput (2002), in: IIE Transactions, 34(23-40) | , and ,
Two Exact Formulations for Disassembly Line Balancing Problem and Task Precedence Diagram Construction using AND/OR Graph (2009), in: IIE Transactions, 41(866-881) | , and ,
Two Exact Formulations for Dissembly Line Balancing Problem and Task Precedence Diagram Construction using AND/OR Graph (2009), in: IIE Transactions, 41(866-881) | , and ,
Customer order scheduling problem: a comparative metaheuristics study (2008), in: Int J of Advanced Manufacturing Technology, 37(589-598) | , and ,
Customer order scheduling problem: a comparative metaheuristics study (2008), in: Int J of Advanced Manufacturing Technology, 37(589-598) | , and ,
ISO 9000 implementation in Turkish industry (1998), in: Int J of Operations and Production Management, 17(1233-1246) | and ,
Analyses of serial production line systems for interdeparture time variability and WIP inventory systems (2005), in: Int J of Operations and Quantitative Management, 10(275-295) | , and ,
A goal programming approach to mixed model assembly line balancing problem (1997), in: Int J of Production Economics, 48(177-185) | and ,
A study on production lines with discrete batch WIP inventory transfer (1999), in: Int J of Production Economics, 55(71-85) | ,
Ant colony optimization for the single model U-type assembly line balancing problem (2010), in: Int J of Production Economics, 120(287-300) | , and ,
Ant colony optimization for the single model U-type assembly line balancing problem (2010), in: Int J of Production Economics, 120(287-300) | , and ,
Balancing of U-type assembly systems using simulated annealing (2001), in: Int J of Production Research, 39(3003-3015) | , and ,
Balancing of U-type assembly systems using simulated annealing (2001), in: Int J of Production Research, 39(3003-3015) | , and ,
Effect of discrete batch WIP transfer on the efficiency (1994), in: Int J of Production Research, 31(1827-1838) | ,
Stochastic assembly line balancing using beam search (2005), in: Int J of Production Research, 43(1411-1426) | , and ,
Stochastic assembly Line Balancing using Beam Search (2005), in: Int J of Production Research, 43(1411-1426) | , and ,
Analysis of Serial Production Lines: Characterization Study and a New Heuristic Procedure for Optimal Buffer Allocation (2006), in: Int J of Production Research, 44(2499-2523) | , and ,
Analysis of serial production lines: characterization study and a new heuristic procedure for optimal buffer allocation (2006), in: Int J of Production Research, 44(2499-2523) | , and ,
Mixed Model Assembly Line Sequencing Using Beam Search (2007), in: Int J of Production Research, 45(5265-5284) | , and ,
Mixed-model assembly line sequencing using beam search (2007), in: Int J of Production Research, 45(5265-5284) | , and ,
Analyses of Serial Production Line Systems for Interdeparture Time Variability and WIP Inventory Systems (2005), in: Int J of Quantitative Operations Management | , and ,
Management Information Systems in Family Planning: Experience of a Developing Country (1992), in: International Forum on Information and Documentation, 17(20-24) | and ,
J
Assembly line balancing using genetic algorithms (1999), in: J of Intelligent Manufacturing, 11(295-310) | , and ,
Assembly line balancing using genetic algorithms (1999), in: J of Intelligent Manufacturing, 11(295-310) | , and ,
New heuristic for the dynamic layout problem (2004), in: J of Operational Research Society, 54(1275-1282) | , and ,
O
A methodology for solving single-model, stochastic assembly line balancing problem (1999), in: Omega - Int J of Management Science, 27(525-535) | , and ,
Effect of continuous price exchange in the EOQ rejoinder (1993), in: Omega - Int J of Management Science, 21(595-596) | ,
P
A survey of the assembly line balancing procedures (1999), in: Production Planning and Control, 9(414-434) | and ,
T
Distribution of quality costs: evidence from an aeronautical firm (2000), in: Total Quality Management, 11(227-234) | and ,
Distribution of quality costs: evidence from an aeronautical firm (2000), in: Total Quality Management, 11(227-234) | and ,