Publications of Akturk, M.S. sorted by journal
C
Dynamic lot sizing and tool management in automated manufacturing systems (2001), in: Computers and Operations Research, 29(1059-1079) | and ,
Pure Cycles in Flexible Robotic Cells (2008), in: Computers and Operations Research, 36(329-343) | , and ,
Pure Cycles in Flexible Robotic Cells (2008), in: Computers and Operations Research, 36(329-343) | , and ,
A new lower bounding scheme for the total weighted tardiness problem (1998), in: Computers and Operations Research, 25(265-278) | and ,
Tool magazine arrangement and operation sequencing on CNC machines (1997), in: Computers and Operations Research, 23(1069-1081) | and ,
Scheduling in a three-machine robotic flexible manufacturing cell (2006), in: Computers and Operations Research, 34(2463-2477) | , and ,
Scheduling Parallel CNC Machines with Time/Cost Trade-off Considerations (2006), in: Computers and Operations Research, 34(2774-2789) | and ,
Scheduling with tool changes to minimize total completion time under controllable machining conditions (2006), in: Computers and Operations Research, 34(2130-2146) | , and ,
Scheduling in a Three-Machine Robotic Flexible Manufacturing Cell (2006), in: Computers and Operations Research, 34(2463-2477) | , and ,
Bicriteria robotic operation allocation in a flexible manufacturing cell (2010), in: Computers and Operations Research, 37(779-789) | , and ,
Bicriteria robotic operation allocation in a flexible manufacturing cell (2010), in: Computers and Operations Research, 37(779-789) | , and ,
An analysis of cyclic scheduling problems in robot centered cells (2011), in: Computers and Operations Research | , and ,
An analysis of cyclic scheduling problems in robot centered cells (2011), in: Computers and Operations Research | , and ,
An anticipative scheduling approach with controllable processing times (2011), in: Computers and Operations Research, 37(1002-1013) | , and ,
Single CNC machine scheduling with controllable processing times to minimize total weighted tardiness (2011), in: Computers and Operations Research, 38(771-781) | and ,
Joint lot sizing and tool management in a CNC environment (1999), in: Computers in Industry, 40(61-75) | and ,
D
Robotic cell scheduling with operational flexibility (2005), in: Discrete Applied Mathematics, 145(334-348) | , and ,
Robotic cell scheduling with operational flexibility (2005), in: Discrete Applied Mathematics, 145(334-348) | , and ,
E
Scheduling with tool changes to minimize total completion time: Basic results and SPT performance (2004), in: European J of Operational Research, 157(784-790) | , and ,
Cyclic scheduling of a 2-machine robotic cell with tooling constraints (2006), in: European J of Operational Research, 174(777-796) | , and ,
Cyclic Scheduling of a 2-Machine Robotic Cell with Tooling Constraints (2006), in: European J of Operational Research, 174(777-796) | , and ,
Considering Manufacturing Cost and Scheduling Performance on a CNC Turning Machine (2006), in: European J of Operational Research, 177(325-343) | and ,
Optimal Allocation and Processing Time Decisions on Non-identical Parallel CNC Machines: E-Constraint Approach (2007), in: European J of Operational Research, 183(591-607) | and ,
A new dominance rule to minimize total weighted tardiness with unequal release dates (2001), in: European J Operational Research, 135(394-412) | and ,
Match-up scheduling under a machine breakdown (1998), in: European J Operational Research, 112(80-96) | and ,
Tool Allocation and Machining Conditions Optimization for CNC Machines (1996), in: European J Operational Research, 94(335-348) | and ,
I
An exact approach to minimizing total weighted tardiness with release dates (2000), in: IIE Transactions, 32(1091-1101) | and ,
A problem space algorithm for single machine weighted tardiness problems (2003), in: IIE Transactions, 35(479-486) | , and ,
Predictive/reactive scheduling with controllable processing times and earliness-tardiness penalties (2010), in: IIE Transactions, 41(1080-1095) | , and ,
An integrated process planning approach to CNC machine tools (1996), in: Int J of Advanced Manufacturing Technology, 12(221-229) | and ,
An exact tool allocation approach for CNC machines (1999), in: Int J of Computer Integrated Manufacturing, 2(129-140) | ,
Management of Product Variety in Cellular Manufacturing Systems (2006), in: Int J of Flexible Manufacturing Systems, 17(93-117) | and ,
Dynamic lot-sizing and scheduling in cellular manufacturing systems using hybrid simulation/analytic model (1996), in: Int J of Industrial Engineering, 2(251-260) | and ,
Integrated Scheduling and Tool Management in Flexible Manufacturing Systems (2002), in: Int J of Production Research, 39(2697-2722) | and ,
Single CNC machine scheduling with controllable processing times and multiple due dates (2008), in: Int J of Production Research, 46(6087-6111) | and ,
Scheduling preventive maintenance on a single CNC machine (2008), in: Int J of Production Research, 46(6797-6821) | and ,
A hierarchical model for the cell loading problem of cellular manufacturing systems (1998), in: Int J of Production Research, 36(2005-2023) | and ,
Scheduling of Automated Guided Vehicles in a Decision Making Hierarchy (1996), in: Int J of Production Research, 34(577-591) | and ,
Part-machine Grouping Using a Multi-objective Cluster Analysis (1996), in: Int J of Production Research, 34(2299-2315) | and ,
An overview of design and operational issues of kanban systems[reprinted in May 2004 issue of ICFAI Journal of Operations Management] (2000), in: Int J of Production Research, 37(3859-3881) | and ,
Cellular manufacturing system design using a holonistic approach (2000), in: Int J of Production Research, 38(2327-2347) | and ,
Nonidentical Parallel CNC Machine Scheduling (2003), in: Int J of Production Research, 41(2143-2168) | , and ,
Interaction of design and operational parameters in periodic review kanban systems (2004), in: Int J of Production Research, 41(3315-3338) | , and ,
Due-date and Cost-based FMS Loading, Scheduling and Tool Management (2006), in: Int J of Production Research, 45(1183-1213) | , and ,
Scheduling in Robotic Cells: Process Flexibility and Cell Layout (2007), in: Int J of Production Research, 46(2105-2121) | , and ,
Machining Conditions Based Preventive Maintenance (2007), in: Int J of Production Research, 45(1725-1743) | and ,
Scheduling in Robotic Cells: Process Flexibility and Cell Layout (2007), in: Int J of Production Research, 46(2105-2121) | , and ,
Bicriteria robotic cell scheduling with controllable processing times (2010), in: Int J of Production Research | , and ,
Bicriteria robotic cell scheduling with controllable processing times (2010), in: Int J of Production Research | , and ,
Joint cell loading and scheduling approach to cellular manufacturing systems (2011), in: Int J of Production Research | ,